The Greenlink project has required onshore and offshore planning consents in both Ireland and Wales.

Great Island has been identified as the appropriate location for the connection of the Greenlink interconnector to the existing EirGrid infrastructure. This followed a review of existing grid infrastructure and connection options. Studies are being commenced with EirGrid to confirm the final design, and the connection process is under discussion with EirGrid and the CRU.

In Ireland, Greenlink will consist of a converter station sited close to the existing Great Island substation and underground cabling, which will predominantly be routed within the local road network.

Various detailed technical and environmental surveys have been carried out during the development process to ensure that the final design fully incorporates the challenges and opportunities of the local environment.

Technical and environmental studies have included:

Bird Studies

Avian impact assessments

Ecological Assessments

Habitat and biodiversity evaluations

Construction Studies

Access and methodology planning

Visual Impact

Landscape and visual assessments

Noise Assessments

Acoustic impact analysis

Transport Studies

Traffic and transport assessments

Heritage Assessments

Cultural heritage impact studies

Geological Studies

Ground and subsurface analysis

Hydrology Studies

Water resource and drainage assessments

Bird study
Ecological assessment
Construction study
Landscape assessment
Noise assessment

The developer of the Greenlink project strongly believes that a proactive and constructive dialogue with stakeholders throughout the development programme resulted in a high quality application and project design.

Local Procurement Opportunities

Construction of Greenlink is expected to lead to significant expenditure in Ireland. We are committed to maximising the use of locally-based contractors and personnel during the construction and operational phases of the project and are always keen to hear of local businesses that could benefit.

In November 2021 we held a well-attended Meet the Buyer event in Wexford. If you are a local supplier who has goods or services you think might be of interest, please visit the Suppliers and Procurement page and submit your details.

Submit Supplier Details
500MW
Connection Capacity
2021
Meet the Buyer Event